===SCOORE Definitions===
+
=SCOORE Definitions=
  
==Busy Signal==
 
  
In SCOORE we can set a "busy" signal which means that the following cycle the sent packet would not be processed until the busy is deasserted. E.g: The channel control between Unit A and Unit B could be as follows (the values are available only after clock posedge):
 
  
CLK          0 1 2 3 4  -  5 6 7 8 9 0  -  1 2 3 4 5
+
==Physical Structures Terms==
B_to_A busy  F F T T T      F F T F F F      F T T F F
+
A_to_B DInst  A B C C C      D E F F G H      I J J J K
+
            busy > 2 cycles  busy 1 cycle    busy 2 cycles
+
  
==Logic Terms==
+
===Reservation Station===
 +
 
 +
Instruction window located inside each cluster. Reservation stations (RS) are part of the issue
 +
logic together with scheduler and select.
 +
 
 +
===Scheduler===
 +
 
 +
Main instruction window (scheduler) performed after rename and before select. The scheduler is a
 +
big instruction window with an efficient FPGA mapping. It requires less hardware per entry than
 +
the reservation stations.
 +
 
 +
The scheduler can be activated/deactivated at run-time or compile time and SCOORE still works (with
 +
a lower IPC).
  
 
==Logic Terms==
 
==Logic Terms==
  
=Window Logic=
+
===Window Logic===
  
 
A structure that can insert/remove elements out-of-order. As opposed to a FIFO or LIFO that have insertion/removal
 
A structure that can insert/remove elements out-of-order. As opposed to a FIFO or LIFO that have insertion/removal
 
constraints.
 
constraints.
  
=In-Flight Instructions=
+
===Wakeup/Select===
 +
 
 +
Whenever an element can be removed from a window logic. It is necessary to '''wakeup''' (set ready) the entry and decide or '''select''' which entry from the currently ready should be removed from the window logic.
 +
 
 +
===Busy Paradigm===
 +
 
 +
In SCOORE we can set a "busy" signal which means that the receiving unit has notified the sending unit that it can NOT accept anymore inputs.
 +
For a "busy: implementation this means that the sending unit will send the new data compared to when busy initially went high. Sender will continue to send this data until 1 cycle AFTER busy goes low. E.g: The channel control between Unit A and Unit B could be as follows (the values are available only after clock posedge).
 +
 
 +
===Retry Paradigm===
 +
 
 +
In SCOORE we can also use the "retry" paradigm, which is slightly different than busy paradigm. For retry the sending unit must remember the output data that was sent on the cycle that busy went high to the receiving unit.  It will "retry", keep resending this data, until busy is goes low and for one cycle after that.
 +
 
 +
===Timing Description===
 +
A is sending unit:
 +
B is receiving unit:
 +
 
 +
ALL signals are in reference to what A see as input on rising edge of clock.
 +
ALL signals are in reference to what A sets as output on rising edge of clock. 
 +
 
 +
Description of signals below: CLK = clock
 +
The top row of numbers to the right of the CLK signal represent a given clock period.
 +
The F(false) and T(true)signals just underneath the numbers represent that the signal is
 +
set as input to A in case of "B_to_A busy" or set as output from A in case of "A_to_B Dinst"
 +
 
 +
====Retry Paradigm====
 +
CLK          0 1 2 3 4 5  - 0 1 2 3 4 5    -1 2 3 4 5
 +
B_to_A busy  F F T T T F    F F T F F F      F T T F F
 +
A_to_B DInst  A B C C C C    D E F F G H      I J J J K
 +
            busy > 2 cycles  busy 1 cycle    busy 2 cycles
 +
 
 +
====Busy Paradigm====
 +
CLK          0 1 2 3 4 5  - 0 1 2 3 4 5    -1 2 3 4 5
 +
B_to_A busy  F F T T T F    F F T F F F      F T T F F
 +
A_to_B DInst  A B C D D C    D E F G H I      I J K K L
 +
            busy > 2 cycles  busy 1 cycle    busy 2 cycles
 +
 
 +
===In-Flight Instructions===
  
 
In-flight instructions refers to the total number of instructions being process by SCOORE. It starts from
 
In-flight instructions refers to the total number of instructions being process by SCOORE. It starts from
Line 26: Line 70:
 
NOTE that it is NOT the same as the ROB size which accounts from the rename stage until retire stage.
 
NOTE that it is NOT the same as the ROB size which accounts from the rename stage until retire stage.
  
 +
===General Terms===
 +
Broadcast- Is used to denote the global broadcast of a signal.  For example one cluster of the Compute Engine will broadcast a position value, letting all listening parties know that the corresponding data is coming on the next cycle.
  
===RAMP Relation===
+
=RAMP Relation=
  
 
RAMP is a collaborative research community that aims at using FPGAs to accelerate processor simulations. Most RAMP projects aim at multiprocessor acceleration.
 
RAMP is a collaborative research community that aims at using FPGAs to accelerate processor simulations. Most RAMP projects aim at multiprocessor acceleration.
Line 41: Line 87:
  
 
-'''Platform RTL''': Each model and unmodel RTL needs to be synthesized in a specific FPGA platform. The platform RTL is the RTL specific for each platform.  
 
-'''Platform RTL''': Each model and unmodel RTL needs to be synthesized in a specific FPGA platform. The platform RTL is the RTL specific for each platform.  
 
  
 
The RAMP project aims at providing a common interface to avoid platform and unmodel RTL. SCOORE can benefit as it could potentially reuse both.
 
The RAMP project aims at providing a common interface to avoid platform and unmodel RTL. SCOORE can benefit as it could potentially reuse both.
 
  
 
== Unit / Channel ==
 
== Unit / Channel ==
Line 56: Line 100:
 
-Channels have an initialization
 
-Channels have an initialization
 
-A firing happens when a unit reads/consumes all the inputs and generates all the outputs.
 
-A firing happens when a unit reads/consumes all the inputs and generates all the outputs.
 
  
 
The RAMP channels are similar to the SCOORE inter-block communication. In SCOORE:
 
The RAMP channels are similar to the SCOORE inter-block communication. In SCOORE:
  
 
-All the inputs are read every cycle. The unit or block is responsible to read. A key difference is the handling of the busy signal previously explained.
 
-All the inputs are read every cycle. The unit or block is responsible to read. A key difference is the handling of the busy signal previously explained.
 
  
 
-RAMP uses a "enable" signal to notify that the channel has data. We use a "valid" signal. E.g:
 
-RAMP uses a "enable" signal to notify that the channel has data. We use a "valid" signal. E.g:

Latest revision as of 15:33, 8 April 2010

SCOORE Definitions

Physical Structures Terms

Reservation Station

Instruction window located inside each cluster. Reservation stations (RS) are part of the issue logic together with scheduler and select.

Scheduler

Main instruction window (scheduler) performed after rename and before select. The scheduler is a big instruction window with an efficient FPGA mapping. It requires less hardware per entry than the reservation stations.

The scheduler can be activated/deactivated at run-time or compile time and SCOORE still works (with a lower IPC).

Logic Terms

Window Logic

A structure that can insert/remove elements out-of-order. As opposed to a FIFO or LIFO that have insertion/removal constraints.

Wakeup/Select

Whenever an element can be removed from a window logic. It is necessary to wakeup (set ready) the entry and decide or select which entry from the currently ready should be removed from the window logic.

Busy Paradigm

In SCOORE we can set a "busy" signal which means that the receiving unit has notified the sending unit that it can NOT accept anymore inputs. For a "busy: implementation this means that the sending unit will send the new data compared to when busy initially went high. Sender will continue to send this data until 1 cycle AFTER busy goes low. E.g: The channel control between Unit A and Unit B could be as follows (the values are available only after clock posedge).

Retry Paradigm

In SCOORE we can also use the "retry" paradigm, which is slightly different than busy paradigm. For retry the sending unit must remember the output data that was sent on the cycle that busy went high to the receiving unit. It will "retry", keep resending this data, until busy is goes low and for one cycle after that.

Timing Description

A is sending unit: B is receiving unit:

ALL signals are in reference to what A see as input on rising edge of clock. ALL signals are in reference to what A sets as output on rising edge of clock.

Description of signals below: CLK = clock The top row of numbers to the right of the CLK signal represent a given clock period. The F(false) and T(true)signals just underneath the numbers represent that the signal is set as input to A in case of "B_to_A busy" or set as output from A in case of "A_to_B Dinst"

Retry Paradigm

CLK           0 1 2 3 4 5   - 0 1 2 3 4 5     -1 2 3 4 5 
B_to_A busy   F F T T T F     F F T F F F      F T T F F
A_to_B DInst  A B C C C C     D E F F G H      I J J J K
            busy > 2 cycles   busy 1 cycle     busy 2 cycles

Busy Paradigm

CLK           0 1 2 3 4 5   - 0 1 2 3 4 5     -1 2 3 4 5 
B_to_A busy   F F T T T F     F F T F F F      F T T F F
A_to_B DInst  A B C D D C     D E F G H I      I J K K L
            busy > 2 cycles   busy 1 cycle     busy 2 cycles

In-Flight Instructions

In-flight instructions refers to the total number of instructions being process by SCOORE. It starts from the moment that an instruction is fetched until the instruction is retired.

NOTE that it is NOT the same as the ROB size which accounts from the rename stage until retire stage.

General Terms

Broadcast- Is used to denote the global broadcast of a signal. For example one cluster of the Compute Engine will broadcast a position value, letting all listening parties know that the corresponding data is coming on the next cycle.

RAMP Relation

RAMP is a collaborative research community that aims at using FPGAs to accelerate processor simulations. Most RAMP projects aim at multiprocessor acceleration.

This is a similar goal to SCOORE, a major difference is that RAMP does not have an emphasis on ASIC or synthesis but rather on the FPGA acceleration.

RTL Layers

RAMP common interface divides the RTL implementation in 3 blocks:

-Model RTL: The RTL required to implement a CPU/Memory/... model. Equivalen to the synos/scoore directory.

-Unmodel RTL: The RTL required to gather statistics or control the modeled architecture. It may not be necessary to execute instructions in the model architecture, but it is a requirement for researchers.

-Platform RTL: Each model and unmodel RTL needs to be synthesized in a specific FPGA platform. The platform RTL is the RTL specific for each platform.

The RAMP project aims at providing a common interface to avoid platform and unmodel RTL. SCOORE can benefit as it could potentially reuse both.

Unit / Channel

RAMP partitions the design into units and channels. Main characteristics:

-Units only communicate through channels -Units wait until all the inputs (in channels) are ready before generating outputs (out channels) -Channels have a fixed latency -Channels are unidirectional -Channels have an initialization -A firing happens when a unit reads/consumes all the inputs and generates all the outputs.

The RAMP channels are similar to the SCOORE inter-block communication. In SCOORE:

-All the inputs are read every cycle. The unit or block is responsible to read. A key difference is the handling of the busy signal previously explained.

-RAMP uses a "enable" signal to notify that the channel has data. We use a "valid" signal. E.g:

 typedef struct packed{
   BoolType                            valid; // equivalent to the RAMP enable
   BoolType                            fault;
   RIDType                             RID;
   OPType                              op;
   PRegType                            psrc1;
   PRegType                            psrc2;
   IMMType                             imm;
   PRegType                            pdest;
 }DInst_SEType;